The Live Ahmedabad
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured

The Live Ahmedabad

  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
Ahmedabad City

New Saraspur Entrance to Ease Festive Rush at Ahmedabad Railway Station

by TLAteam October 15, 2026October 15, 2026
written by TLAteam October 15, 2026October 15, 2026
New Saraspur Entrance to Ease Festive Rush at Ahmedabad Railway Station

Ahmedabad Railway Station has opened a new entrance at Saraspur to provide additional access for passengers and reduce crowding at existing entry points, especially during the festive season.

Ahmedabad West MP Dinesh Makwana and Bapunagar MLA Dineshsinh Kushwaha inaugurated the new entrance and an integrated foot overbridge (FOB) on Wednesday. Ahmedabad Divisional Railway Manager (DRM) Ved Prakash and senior officials from NHSRCL, RLDA and Western Railway were also present.

The integrated FOB currently has 10 operational escalators and lifts. A lift is also being constructed at the new entrance and will be opened for passengers soon.During the visit, the MP and MLA reviewed the redevelopment of Ahmedabad Railway Station and the ongoing construction of the Mumbai-Ahmedabad bullet train station.

DRM Ved Prakash said the station redevelopment is being carried out in phases while ensuring that regular train operations and passenger services continue without disruption. He added that passenger safety, convenience and uninterrupted railway operations remain the top priorities during construction.The railway station is being developed as a multimodal transport hub connecting Indian Railways, the bullet train station and the nearby metro station.

Direct access between the metro station and the railway station is also planned.Railway officials said construction of all 14 floors of the South Multimodal Transport Hub (MMTH) building has been completed. Passenger Reservation System (PRS) facilities, cloakrooms, digital lockers and waiting rooms have been shifted to the building.

Entry and exit through Platform 1 have also started.Work on the North MMTH building is expected to be planned soon. Construction work on Sarangpur Bridge is also underway, followed by work at Kalupur to avoid simultaneous traffic disruptions.

0 comment
previous post
Taxi and Bike Booking Facilities Start at Ahmedabad and Sabarmati Railway Stations
next post
Air India Passengers Face Food and Water Shortage During 4.5-Hour Wait at Mumbai Airport

You may also like

Ahmedabad Municipal Commissioner reviews civic issues, orders action...

November 5, 2026

Ahmedabad railway stations step up security with 240...

November 5, 2026

Ahmedabad Institute of Technology celebrates Diwali with traditional...

November 5, 2026

LJK University Celebrates Diwali with Festivities and Staff...

November 5, 2026

Ahmedabad-Hanoi Direct Flight Service Begins; Vietnam Airlines to...

November 4, 2026

Ahmedabad’s 4.03-km Sarkhej–Karnavati Club Elevated Corridor to Open...

November 4, 2026

Ahmedabad Parking Charges Set to Rise; Two-Wheeler Rates...

November 4, 2026

Poonam Bajwa Serves Sweet Smiles And Sizzling Bikini...

November 4, 2026

Ahmedabad Train Fares to Drop as 6 Superfast...

November 4, 2026

Western Railway to Run Special Unreserved Train Between...

November 4, 2026
[bsa_pro_ad_space id=7]

Recent Posts

  • India-Sri Lanka ODI Moves to Vizag Due to Weather Woes

    November 6, 2026
  • Physical Aadhaar Photocopies No Longer Needed for Hotel Check-ins, Gig Worker Verification

    November 5, 2026
  • WhatsApp malware alert: Fake invoices and salary files sent from trusted contacts; CERT-In warns Indian users

    November 5, 2026
  • Rajinikanth’s Jailer 2: OTT release date, platform, storyline and star cast revealed

    November 5, 2026
  • Ahmedabad Municipal Commissioner reviews civic issues, orders action against pollution violations and encroachments

    November 5, 2026
October 2026
MTWTFSS
 1234
567891011
12131415161718
19202122232425
262728293031 
« Sep Nov »
The Live Ahmedabad
Footer Logo
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
  • Privacy Policy
  • Disclaimer
  • Cookie Policy
  • Terms of use
  • Advertise with Us
  • Work With Us
  • Contact Us

© 2021 - The Live Ahmedabad. All Rights Reserved.