The Live Ahmedabad
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured

The Live Ahmedabad

  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
Ahmedabad City

Cruise Tourism to Come Up on Gujarat’s Narmada and Tapi Rivers

by TLAteam August 24, 2026August 24, 2026
written by TLAteam August 24, 2026August 24, 2026
Cruise Tourism to Come Up on Gujarat’s Narmada and Tapi Rivers

Gujarat could soon see a major boost in cruise and inland waterway tourism, with the Centre preparing to develop the Narmada and Tapi rivers for passenger and cargo movement.

The Inland Waterways Authority of India (IWAI) has signed a tripartite agreement with the Sardar Sarovar Narmada Nigam Limited and the Madhya Pradesh government to develop the Narmada waterway between the two states.

More than ₹70 crore has been allocated for surveys and infrastructure on the Narmada. IWAI has prepared a four-phase plan to develop the river stretch from the Gulf of Khambhat to Madhya Pradesh as an inland waterway.

The first phase, from Opl to Garudeshwar, is estimated to cost over ₹37 crore, while the second phase could require around ₹150 crore. Passenger jetties have also been proposed along the Bharuch-Garudeshwar stretch.

Funds for Narmada Waterway

IWAI has allocated more than ₹45 crore for dredging, river conservancy and navigation facilities. Another ₹12 crore has been set aside for terminals, land acquisition and connectivity. Additional funds will support hydraulic surveys, cargo promotion and other activities.

Tapi River Also in Focus

IWAI has prepared a detailed report on using the Tapi River for cargo transportation. The proposed waterway would cover around 170 km from Ukai Dam to the Gulf of Khambhat.

While cargo vessels and barges already operate on some parts of the route, ferry services are not currently available. The report recommends dredging the river and developing two terminals between Dumas and the Old Fort.

The first phase is estimated to cost around ₹55 crore, while extending the waterway up to Ukai Dam in the second phase could require nearly ₹2,000 crore.

Silt and Low Water May Pose Challenges

The development of both waterways could face technical challenges due to heavy silt and sand deposits, which would require regular dredging. Water levels in both rivers also fall significantly during summer.

However, the assessment suggests that the available water could support medium-sized passenger and cargo vessels, potentially opening the way for cruise tourism and improved river-based transport in Gujarat.

0 comment
previous post
CC Sheth College Hosts Entrepreneurship Session
next post
The Leela Gandhinagar Celebrates Raksha Bandhan with ‘Threads of Love’

You may also like

Surat Textile Workers Protest Amid Industry Turmoil

October 9, 2026

Gujarat High Court Pressures Government on Traffic Safety...

October 9, 2026

Gujarat to Set Minimum Fares for App-Based Cabs...

October 9, 2026

Ahmedabad Police SHE Teams Adopt Gen-Z-Friendly Approach Ahead...

October 9, 2026

Gujarat Commerce College Organises Campus Placement Drive

October 9, 2026

AIT Students Learn About Cyber Forensics

October 9, 2026

Delhi Metro to Shut Down Amid Protest Plans

October 9, 2026

Design Gully Brings Creativity and Sustainability to LJ...

October 9, 2026

Ahmadabad Says No to Big Trees by Billboards!

October 9, 2026

Vegetable Prices Skyrocket Ahead of Festivals

October 9, 2026
[bsa_pro_ad_space id=7]

Recent Posts

  • Sun to Enter Chitra Nakshatra on October 11: These 4 Zodiac Signs May See Positive Changes

    October 9, 2026
  • Eveready Diversifies into Mosquito Protection with India’s First Portable Liquid Vaporiser

    October 9, 2026
  • VTA Welcomes GST 2.0 Reforms; Urges Government to Protect and Reward Honest Taxpayers

    October 9, 2026
  • GSFC University Partners with Lupin Manufacturing Solutions Ltd.

    October 9, 2026
  • Surat Textile Workers Protest Amid Industry Turmoil

    October 9, 2026
August 2026
MTWTFSS
 12
3456789
10111213141516
17181920212223
24252627282930
31
« Jul Sep »
The Live Ahmedabad
Footer Logo
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
  • Privacy Policy
  • Disclaimer
  • Cookie Policy
  • Terms of use
  • Advertise with Us
  • Work With Us
  • Contact Us

© 2021 - The Live Ahmedabad. All Rights Reserved.