The Live Ahmedabad
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured

The Live Ahmedabad

  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
Gujarat

Palladium Mall Crossroads on SG Highway to Remain Signal-Free for 3-Day Traffic Trial

by TLAteam May 21, 2026May 21, 2026
written by TLAteam May 21, 2026May 21, 2026
Palladium Mall Crossroads on SG Highway to Remain Signal-Free for 3-Day Traffic Trial

Authorities have launched a pilot project to make the Palladium Mall crossroads on SG Highway signal-free for three days in an effort to reduce traffic congestion.

Seven flyovers have already been built between Sarkhej and Gandhinagar to make SG Highway signal-free. While these flyovers have eased traffic flow on the main highway, congestion still occurs at traffic signals located beneath the bridges. Officials have now decided to gradually make these junctions signal-free as well.

As part of the trial, the Palladium Mall junction has been selected for the first experiment.

Currently, two traffic cuts exist beneath the flyover. Vehicles coming from the Thaltej side can take a right turn around 50 metres before the main intersection, while commuters from the Gota side can use an existing cut for U-turns before reaching the crossroads.

Under the new traffic plan, an additional cut will be created beneath the bridge for vehicles travelling from Zydus Hospital towards Palladium Mall and Gota. A similar arrangement will also be made for motorists approaching from the Thaltej side.

Officials said a total of four cuts will be introduced to make the junction signal-free. If the pilot project successfully reduces congestion, similar traffic arrangements may be introduced at other SG Highway junctions.

Civic officials said the experiment is being carried out jointly with the traffic police by restricting vehicle movement at the crossroads on a temporary basis. If the results are positive, the arrangement could become permanent. If problems arise, authorities will study the issues and make necessary corrections.

Under the proposed changes, motorists travelling from Thaltej towards Palladium Mall will no longer be allowed to cross directly at the intersection. Instead, they will have to use a newly planned right turn near the High Court area to directly access SG Highway and continue towards Palladium Mall.

0 comment
previous post
LinkedIn to Lay Off More Than 600 Employees in the US
next post
Amdavad Municipal Corporation Launches Experimental Traffic Management System on S G Highway

You may also like

Valsad-Vadnagar Express to Stop at Ankleshwar, Bandra-Jaipur Express...

October 14, 2026

Delhi-Mumbai Expressway: Limkheda-Godhra Section Officially Opens

October 13, 2026

Gujarat High Court Directs State to Reimburse Jeweller...

October 12, 2026

Gujarat Registration Department Employees to Begin Protest on...

October 12, 2026

SGST Cracks Down on Navratri Food Stalls in...

October 12, 2026

Gujarat to Build Yatri Niwas in Ayodhya at...

October 9, 2026

Students Prefer Ayurveda Over Traditional Medicine Amid Admission...

October 9, 2026

Tragic Accident in Kutch Claims Seven Lives

October 9, 2026

Sanctuaries, national parks to reopen tomorrow

October 8, 2026

Veteran Actor Nana Patekar Passes Away at 75

October 8, 2026
[bsa_pro_ad_space id=7]

Recent Posts

  • Jio Sets IPO Price Band at 1,065–1,119; Issue Could Raise 30,213 Crore

    October 15, 2026
  • DPS–Bopal Athlete Rishanvee Joshi Shines at State Athletics Meet

    October 15, 2026
  • Caller Names to Appear on Phone Screens From November 1 Under New DoT Rules

    October 15, 2026
  • Dr. Rahul Mirchandani Decodes Entrepreneurship, Agri-Tech and the Future of Indian Agriculture at GLS University

    October 15, 2026
  • Mumbai Police Issues Notice to Imran Khan to Leave India by October 28 Over Protest Participation

    October 15, 2026
May 2026
MTWTFSS
 123
45678910
11121314151617
18192021222324
25262728293031 
« Apr Jun »
The Live Ahmedabad
Footer Logo
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
  • Privacy Policy
  • Disclaimer
  • Cookie Policy
  • Terms of use
  • Advertise with Us
  • Work With Us
  • Contact Us

© 2021 - The Live Ahmedabad. All Rights Reserved.