The Live Ahmedabad
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured

The Live Ahmedabad

  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
Gujarat

Palladium Mall Crossroads on SG Highway to Remain Signal-Free for 3-Day Traffic Trial

by TLAteam May 21, 2026May 21, 2026
written by TLAteam May 21, 2026May 21, 2026
Palladium Mall Crossroads on SG Highway to Remain Signal-Free for 3-Day Traffic Trial

Authorities have launched a pilot project to make the Palladium Mall crossroads on SG Highway signal-free for three days in an effort to reduce traffic congestion.

Seven flyovers have already been built between Sarkhej and Gandhinagar to make SG Highway signal-free. While these flyovers have eased traffic flow on the main highway, congestion still occurs at traffic signals located beneath the bridges. Officials have now decided to gradually make these junctions signal-free as well.

As part of the trial, the Palladium Mall junction has been selected for the first experiment.

Currently, two traffic cuts exist beneath the flyover. Vehicles coming from the Thaltej side can take a right turn around 50 metres before the main intersection, while commuters from the Gota side can use an existing cut for U-turns before reaching the crossroads.

Under the new traffic plan, an additional cut will be created beneath the bridge for vehicles travelling from Zydus Hospital towards Palladium Mall and Gota. A similar arrangement will also be made for motorists approaching from the Thaltej side.

Officials said a total of four cuts will be introduced to make the junction signal-free. If the pilot project successfully reduces congestion, similar traffic arrangements may be introduced at other SG Highway junctions.

Civic officials said the experiment is being carried out jointly with the traffic police by restricting vehicle movement at the crossroads on a temporary basis. If the results are positive, the arrangement could become permanent. If problems arise, authorities will study the issues and make necessary corrections.

Under the proposed changes, motorists travelling from Thaltej towards Palladium Mall will no longer be allowed to cross directly at the intersection. Instead, they will have to use a newly planned right turn near the High Court area to directly access SG Highway and continue towards Palladium Mall.

0 comment
previous post
LinkedIn to Lay Off More Than 600 Employees in the US
next post
Amdavad Municipal Corporation Launches Experimental Traffic Management System on S G Highway

You may also like

Centre Plans to Privatise 11 Airports, Roadshows to...

October 21, 2026

Two Workers Killed, Six Injured as Sand-Laden Dumper...

October 21, 2026

Gujarat University Admits 1,143 Students to Online Courses

October 21, 2026

Three Killed, Including Final-Year MBBS Student, as Speeding...

October 21, 2026

‘Gujarat Needs Ban on Obscene Garba Like UP’:...

October 20, 2026

Diwali Crackers Allowed Only From 8 PM to...

October 20, 2026

15-Year-Old Toy Train to Be Replaced at Kankaria...

October 20, 2026

Dussehra: Bahucharaji Mata Adorned With ₹300 Crore Navlakha...

October 20, 2026

Aneet Padda Wins Praise for Ramp Walk at...

October 19, 2026

Ambaji Railway Station to Be Built on Temple...

October 19, 2026
[bsa_pro_ad_space id=7]

Recent Posts

  • Jio Platforms IPO Breaks Five Records as Rs 30,213-Crore Issue Sees Record Subscription Speed

    October 21, 2026
  • Centre Plans to Privatise 11 Airports, Roadshows to Attract Global Investors

    October 21, 2026
  • Two Workers Killed, Six Injured as Sand-Laden Dumper Crushes Car on Morbi Highway

    October 21, 2026
  • AMC Complaint Apps Fail to Register Citizens’ Grievances in Ahmedabad

    October 21, 2026
  • Gujarat University Admits 1,143 Students to Online Courses

    October 21, 2026
May 2026
MTWTFSS
 123
45678910
11121314151617
18192021222324
25262728293031 
« Apr Jun »
The Live Ahmedabad
Footer Logo
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
  • Privacy Policy
  • Disclaimer
  • Cookie Policy
  • Terms of use
  • Advertise with Us
  • Work With Us
  • Contact Us

© 2021 - The Live Ahmedabad. All Rights Reserved.