The Live Ahmedabad
  • Home
  • Ahd City
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured

The Live Ahmedabad

  • Home
  • Ahd City
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
Gujarat

Ahmedabad to get new ₹367 crore bridge from GMFB grant

by TLAteam October 5, 2024
written by TLAteam October 5, 2024
Ahmedabad to get new ₹367 crore bridge from GMFB grant

The Sabarmati Riverfront Development Project’s Phase II includes the construction of a barrage-cum-bridge from the Torrent Powerhouse in the west to Shahibaug at a cost of ₹367 crore.

Business News

All expenses for this bridge will be covered by grants from the Gujarat Municipal Finance Board (GMFB).

The barrage within the riverfront project will operate and maintain a rubber barrage based on an automated control system. During water shortages in the city, approximately 10 to 15 days’ worth of water can be sent for purification through the Kotarpur intake well.

The operation and maintenance of the rubber barrage will be based on an automatic control system, which will ensure that the barrage can be deflected without obstructing the flow of the river during floods.

The contract for the rubber-type barrage has been awarded to YOOIL Envirotech Pvt Ltd from South Korea. Rajkamal Builder Infrastructure Pvt Ltd has been tasked with the work related to water storage, road networks, civil works, and street lighting for the city of Ahmedabad.

Key features of the bridge

Footpaths will be provided on both sides of the bridge, along with full connectivity to the main bridge from all four sides via riverfront roads.

A footpath with a tensile roofing structure, 3 metres wide, will be constructed beneath the deck of the main bridge.

The main span of the bridge will feature a 126-metre-long steel arch, with both ends having suspended arch spans of 42 metres. The remaining spans will be made of RCC prestressed girders.

Theme-based decorative lighting will be installed, and a provision for lock gates for water transportation will be made.

0 comment
previous post
IndiGo System Slowdown: Frustrated Passengers Lash Out at Airline Over Long Queues
next post
One side of Nirnaynagar Underpass shut for repair work

You may also like

Three Killed in Separate Road Accidents in Ahmedabad...

June 7, 2025

19 Child Labourers Rescued from Jewellery Unit in...

June 7, 2025

Forest Dept Fines 5 for Entering Gir to...

June 6, 2025

RBI Surprises with 50 bps Rate Cut Amid...

June 6, 2025

Visitor Parking Shortage Creating Big Problems in Cities

June 6, 2025

GTU Recommends Up to 18 Grace Marks for...

June 6, 2025

Seven Pilgrims Fall Into Sea in Dwarka; One...

June 6, 2025

Gujarat Eases RTI Rules: First 5 Pages Free,...

June 6, 2025

Fire break out at chemical company in Vadodara,...

June 5, 2025

Surat businessman gets notice after Operation Sindoor-themed installation...

June 5, 2025

Leave a Comment Cancel Reply

Save my name, email, and website in this browser for the next time I comment.

Business News

Recent Posts

  • Former Congress Chief Sonia Gandhi’s Health Deteriorates in Shimla

    June 7, 2025
  • Fun to Your June with Drama, Music & More This Weekend

    June 7, 2025
  • Goodbye to PIN Code: India Post Launches DigiPIN — A 10-Digit Digital Address

    June 7, 2025
  • Disha Patani Turns Up the Heat with Scorching Bikini Looks

    June 7, 2025
  • Bengaluru PG Hostels Face 25% Loss as More Residents Opt for Apartments and Self-Cooking

    June 7, 2025
October 2024
MTWTFSS
 123456
78910111213
14151617181920
21222324252627
28293031 
« Sep Nov »
The Live Ahmedabad
Footer Logo
  • Home
  • Ahd City
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
  • Privacy Policy
  • Disclaimer
  • Cookie Policy
  • Terms of use
  • Advertise with Us
  • Work With Us
  • Contact Us

© 2021 - The Live Ahmedabad. All Rights Reserved.