The Live Ahmedabad
  • Home
  • Ahd City
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured

The Live Ahmedabad

  • Home
  • Ahd City
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
Ahmedabad City

SP Ring Road set for six-lane expansion

by TLAteam October 22, 2024October 22, 2024
written by TLAteam October 22, 2024October 22, 2024
SP Ring Road set for six-lane expansion

The Ahmedabad Urban Development Authority (Auda) has prepared a detailed project report (DPR) for a major upgrade of t he SP Ring Road, a 76-km stretch that encircles the city. With traffic increasing, the road will be widened to six lanes at an estimated cost of over Rs 2,000 crore.
In April, Auda appointed a consultant to oversee the project. Their report, soon to be submitted to the state’s urban development department, outlines plans for two new flyovers and two underpasses. The Tragad underpass will be widened to six lanes, and flyovers are planned at Aslali Junction and the Dholera Expressway junction. These infrastructural enhancements aim to streamline traffic flow and improve safety on SP Ring Road.

Business News

“One major benefit is that no new land will be acquired for the project, minimising disruption to nearby areas. The current 60-m wide road will be used for the expansion,” said an Auda official. The DPR also explores options for rebuilding or extending the Bhat and Komod river bridges, ensuring the road’s structural integrity.
The SP Ring Road’s current width varies, with the eastern section being 42-m wide with 18-m wide service roads on both sides, totalling approximately 78 meters in width.

The western section is 42-m wide with 9-m wide service roads on both sides.
The new design will feature three lanes on each side while keeping the service roads intact. After the DPR is finalised, Auda will consider three options for funding and implementation: through toll collection, a build-operate-transfer (BOT) model, or a public-private partnership (PPP) by granting advertising rights.
This project has seen several revisions over the years. In Feb 2019, Auda had approved a Rs 200 crore expansion proposal.

However, Auda did not agree to extend the concession agreement by 3.5 years in exchange for this expenditure, leading the concessionaire company, ARRIL, to withdraw from the project in 2021.
Subsequently, Auda re-tendered the project. “This March, tenders were issued for appointing a consultant-cum-advisor, and the consultant was appointed in April, just before the announcement of the Lok Sabha election cod

0 comment
previous post
Fake court busted in Ahmedabad; conman, who passed orders as ‘judge’, arrested
next post
Titan Smart introduces a new range of fashion first smartwatches with premium material and contemporary designs, Crown Collection

You may also like

Doctors Investigate Mystery Behind Blurred Vision in 122...

July 2, 2025

4,000 Investors Cheated in ‘Pump-and-Dump’ Scam Run from...

July 1, 2025

Ahmedabad Streets in Trouble: Potholes, Waterlogging Hit 13...

July 1, 2025

Fake Doctor Without Medical Degree Arrested by SOG...

July 1, 2025

Over 100 Dehgam School Students Suffer Blurred Vision;...

July 1, 2025

₹10-Crore National Highway Stretch in Bharuch Washed Away...

June 30, 2025

Social Media Addiction on the Rise in Ahmedabad:...

June 30, 2025

AI 171 Crash: All Angles Under Probe, Including...

June 30, 2025

Vantara Steps In After Rath Yatra Chaos Elephants...

June 29, 2025

AMC to Build ₹51 Crore Sports Complex in...

June 29, 2025

Leave a Comment Cancel Reply

Save my name, email, and website in this browser for the next time I comment.

Business News

Recent Posts

  • SEBI Opens 6-Month Window for Re-Lodging Old Share Transfer Requests

    July 3, 2025
  • Ramayana Yatra to Begin on July 25, Pilgrims to Visit Sacred Sites of Lord Ram

    July 3, 2025
  • Window Frame Comes Loose Mid-Flight on SpiceJet Goa–Pune Flight, No Injuries Reported

    July 2, 2025
  • Water Levels Cross Warning Mark at 11 River Stations Across India, No Extreme Flood Threat Yet: CWC

    July 2, 2025
  • ‘Panchayat’ Season 5 in the Pipeline; Expected Release by Mid-2026

    July 2, 2025
October 2024
MTWTFSS
 123456
78910111213
14151617181920
21222324252627
28293031 
« Sep Nov »
The Live Ahmedabad
Footer Logo
  • Home
  • Ahd City
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
  • Privacy Policy
  • Disclaimer
  • Cookie Policy
  • Terms of use
  • Advertise with Us
  • Work With Us
  • Contact Us

© 2021 - The Live Ahmedabad. All Rights Reserved.