The Live Ahmedabad
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured

The Live Ahmedabad

  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
Ahmedabad City

Union Minister inspects Sabarmati Multimodal Transport Hub

by TLAteam September 14, 2022September 14, 2022
written by TLAteam September 14, 2022September 14, 2022
Union Minister inspects Sabarmati Multimodal Transport Hub

As the terminal station of the Mumbai-Ahmedabad High Speed Rail Corridor, NHSRCL intends to develop Sabarmati HSR as a Multimodal Transport Hub in the region, connecting the HSR line to Indian Railways, Metro station, and Bus Rapid Transit (BRT) system, all of which are located within a short walk for easy transfers.

To provide seamless connectivity and integration between the various transport modes around the HSR station, a Multimodal Transport Hub building has been planned on the East side of Sabarmati HSR station along with three foot overbridges (FOBs), fitted with travellators. These FOBs will connect Hub building with Sabarmati HSR station, both the Sabarmati Railway stations, Metro station and the BRTS stand.

A Multi modal Integration plan for Sabarmati HSR station was developed in consultation with all stakeholders and necessary interventions were proposed such as road widening, redesigning of road geometry and junctions, Table top pedestrian crossings etc.

Special Features of Sabarmati Multimodal Transport Hub building:

The Hub building is being constructed as a twin structure having G+7 & G+9 storey’s with space earmarked for Offices, commercial development and retail outlets for passengers

Proposed Hub building provides connectivity to HSR Station, both sides of Western Railway Stations, Metro Station and BRTS via FOBs. Details of FOBs are as follows:

  • FOB 1 connects Hub building with the Sabarmati (Meter gauge) Railway station and HSR Stations. Travellators will be installed in the FOB for ease of passengers.
  • FOB 2  provides connectivity between Unpaid concourse of Hub building and unpaid concourse of Metro Station and the BRTS stand
  • FOB 3 connects the Unpaid concourse of HSR stations with Railway Platforms of Sabarmati broad gauge railway station

For easy access to the Hub building, dedicated pick up and drop off bays along with ample parking space have been created for private cars, taxis, buses, autos, two wheelers. This shall ensure smooth movement of passengers and traffic in the influence area of HSR station.

Hub building has a dedicated Concourse Floor (at third floor level) for passengers with other amenities such as waiting areas, retail and restaurants.

The building blocks above concourse floor are segregated into two separate block A & B with interconnecting terraces at 2 levels. Block A has 6 floors above concourse reserved for future office space. Block B having 4 floors has been planned with a view to house a Hotel facility having rooms, banquet halls, conference rooms, swimming pool, Restaurant etc.

For passenger interchanging between Indian Railways and HSR a Ticket Counter facility for Indian Railways will be provided in Hub concourse.

Dandi March Mural – To respect the historic context of Sabarmati, a Large Stainless Steel mural depicting the famous Dandi March movement has been made at Southern façade of the building.

Green Building Features- The Hub has a number of green building features. Solar panels on the terraces, extensive landscape terraces and gardens, efficient water fixtures, and energy efficient air conditioning and lighting fixtures are among these features. The majority of the occupied areas throughout the building have plenty of natural light and views of the surroundings.

NHSRCL has issued a tender for the Selection of Transaction Advisor to suggest optional Commercial Utilization of Sabarmati Multimodal Transport Hub on August 24, 2022, with a bid opening date of October 10, 2022.

AhmedabadAhmedabad cityAhmedabad newsGujaratGujarat governmentlatest news
0 comment
previous post
First TMKOC promo featuring new ‘Mehta sahib’
next post
Mouni roy shares her baby planing and Talks About Family’s Pressurear

You may also like

Shreya Dhanwanthary’s Bold Bikini Look Makes a Splash

November 2, 2026

Ahmedabad’s Air Quality Declines Amid Pollution Claims

November 2, 2026

AMC Seals Honest Restaurant and 19 Other Units...

November 2, 2026

No Heavy Homework for Students During Diwali Holidays,...

October 31, 2026

Ahmedabad Uncovers Unsafe Cooking Oil Practices, Seals Four...

October 31, 2026

Edin Rose’s Sultry Red Bikini Look Is Too...

October 30, 2026

Ahmedabad: SMC Busts Illegal Hookah Bar at Cafe...

October 30, 2026

AMC Approves Six New Attractions and Upgradation of...

October 30, 2026

AMC to Scale Down Diwali Decorations to Save...

October 30, 2026

IMNU Students Bring Smiles to Elderly Residents at...

October 30, 2026
[bsa_pro_ad_space id=7]

Recent Posts

  • Man breaks daughter’s phone during argument; she allegedly stabs him to death in Surat

    November 2, 2026
  • TV actor Anuj Thakur passes away after seizure; friend recalls their last meeting 10 days before his death

    November 2, 2026
  • Diwali 2026: 7 things to check on packaged sweet boxes before buying them

    November 2, 2026
  • Ahmedabad gears up for Diwali emergencies; fire brigade, 108 and police roll out joint safety plan

    November 2, 2026
  • Cautious Deepavali – Take Care of Your Eyes, Play Safe

    November 2, 2026
September 2022
MTWTFSS
 1234
567891011
12131415161718
19202122232425
2627282930 
« Aug Oct »
The Live Ahmedabad
Footer Logo
  • Home
  • Ahd City
  • Surat
  • Vadodara
  • Rajkot
  • Business
  • Entertainment
  • Education
  • Crime
  • Health
  • Politics
  • Sports
  • Featured
  • Privacy Policy
  • Disclaimer
  • Cookie Policy
  • Terms of use
  • Advertise with Us
  • Work With Us
  • Contact Us

© 2021 - The Live Ahmedabad. All Rights Reserved.